Latest News from Porthcawl – 18 November 2024

Porthcawl Metrolink now open and ready for use

The new Porthcawl Metrolink is now open and ready for use as part of plans to improve public transport links across the region.

 Located on land at the heart of the regeneration area alongside the Portway and Salt Lake, the new Metrolink forms part of the wider Metro Plus programme and will be used by all bus services currently operating within Porthcawl, including:

  • The First Cymru X2 service between Porthcawl, Bridgend and Cardiff (Monday to Sunday).
  • The First Cymru 63 service between Bridgend and Porthcawl (Monday to Sunday).
  • The Peyton Travel 861 service to Danygraig (Monday to Friday).
  • The Stagecoach In South Wales 172 service from Porthcawl to Aberdare (Sundays only).

Buses will also continue to operate via John Street except for the X2 service and the 63 service’s outbound journey to Bridgend.

Able to accommodate up to four buses at a time, the new Metrolink features a covered shelter and station building, space for a kiosk, outdoor seating areas, an environmentally friendly ‘green’ roof, a rain garden and more.

The new facility has been constructed using money from the Cardiff Capital Region city deal and UK Government as well as the council’s own Porthcawl Regeneration budget, and is designed to form an important part of the town’s ongoing regeneration scheme.

Visit Bridgend council’s website for more information.

 

Rest Bay boardwalk re-opens following a deliberate fire

The popular Rest Bay boardwalk has now re-opened following a recent deliberate fire which destroyed a sixty-metre section of the route and necessitated a temporary closure in the interests of public safety.

Bridgend County Borough Council’s Rights of Way team have since confirmed that the debris and damaged materials have now been removed, and that following an inspection, the temporary closure has been lifted.

The route now consists of the natural surface underneath the boardwalk whilst longer term options are being explored. Short, gently sloping ramps have been added to either end of the missing section to ensure a smooth transition, and to avoid potential trip hazards.

This will remain in place and be regularly inspected throughout the winter period.